PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing split wire above the ceiling at the 4th Floor Facing East (800x600).jpg Duct work at the 1st Floor Facing West (800x600).jpg Installed hangers at the 2nd Floor for the piping Facing North-West (800x600).jpg Installed Sanitary piping at the Servery Room Facing North (600x800).jpg Installing duct work at the 1st Floor Facing East (800x600).jpg Installing the Sanitary piping at the 1st Floor Facing West (800x600).jpg Unloaded metal studs at the 4th Floor Facing East (800x600).jpg
Previous pageNext page Installed hangers at the 2nd Floor for the piping Facing North-West (800x600)
Installed hangers at the 2nd Floor for the piping Facing North-West (800x600)